Development Plans

Development-Plan-ex.png

Bass Coast Shire Council is required to maintain a 15-year supply of developable residential land and consequently undertakes ongoing strategic work to ensure that growth occurs in appropriate areas, where necessary infrastructure can be provided for future communities. In particular, Council undertakes strategic planning projects to provide framework plans for towns in the municipality, guiding growth over the long-term. 

Development plans serve a similar high-level guidance function for a smaller area, focusing on the land where growth has been directed in the town framework plan, to ensure that housing, roads, drainage, open space, transport connections, environmental protections, and other necessary community facilities and services can be provided in a coherent manner and connect to existing infrastructure systems. They ensure that the overall amenity and functionality of the land is not compromised.

The requirement for a developer or landowner to prepare a development plan is triggered by the application of a Development Plan Overlay to the land through a planning scheme amendment. A schedule to the overlay sets out the objectives and requirements for the specified land, based on the local framework plan. Development of the land is restricted until a development plan is endorsed; after endorsement, development applications may be approved if they are 'generally in accordance' with the development plan. A development plan may be amended if circumstances change, by making an application to Council.

A development plan does not cancel out other provisions of the planning scheme, does not make development of the land mandatory, and does not authorise development in itself. Development proposals are still required to obtain a planning permit to proceed, which will generally include conditions requiring the infrastructure identified in the development plan to be provided.

Endorsed Development Plans

How to apply to have a Development Plan endorsed?

If there is not already a development plan applying to land in the DPO, you may need to prepare one before applying for a planning permit to subdivide, construct a building on, or construct or carry out works. Your application will need to be accompanied by the form below:

Development Plan Application Form(PDF, 103KB)

For more information or to discuss your application, contact our Growth Area team by:

Email basscoast@basscoast.vic.gov.au

Requesting a call back online (usually within 48 hours).

Or, if your matter is more urgent, call 1300 BCOAST (226 278) or (03) 5671 2211.