Building work can sometimes place adjoining buildings, land or other property at risk of damage. The Building Act 1993 establishes a formal protection work process to ensure adjoining property is appropriately protected where building work may pose a risk.

As part of the building permit process, the Relevant Building Surveyor (RBS) determines whether protection work is required. Where protection work is required, the building owner must notify the adjoining owner and provide details of the proposed protection measures before the relevant building work can proceed.

The protection work process establishes responsibilities for the building owner, adjoining owner and Relevant Building Surveyor, including requirements for notification, assessment, insurance and recording the condition of adjoining property.

In most cases, the process is administered by the Relevant Building Surveyor.

 

What is protection work?

Protection work is work undertaken to protect adjoining property from damage that may result from proposed building work.

Depending on the proposed construction and the adjoining property, protection work can include:

  • underpinning existing footings

  • providing vertical or lateral support

  • shoring

  • ground anchors

  • measures to protect against changes in earth pressure

  • overhead protection

  • other work required to maintain the stability or safety of adjoining property.

Protection work is separate from the building work itself and must be appropriately designed and documented.

 

When is protection work required?

When assessing a building permit application, the Relevant Building Surveyor must determine whether the proposed building work requires protection of adjoining property.

This will depend on the nature and location of the proposed work and the potential impact on neighbouring property.

Protection work may be relevant where work involves excavation close to a boundary, construction near an existing building, underpinning, retaining structures or other work that could affect the stability or condition of adjoining property.

If protection work is required, the required protection work process must be completed before the relevant building work can proceed.

Council does not make the initial determination that protection work is required for a privately issued building permit. This is the responsibility of the Relevant Building Surveyor.

 

I have been told protection work is required – what happens next?

If your Relevant Building Surveyor determines that protection work is required, you must provide the adjoining owner with formal notice of the proposed protection work.

The notice must include details of the proposed work and the protection measures intended to protect the adjoining property.

The adjoining owner has 14 days after being served with the notice to:

  • agree to the proposed protection work

  • disagree with the proposed protection work; or

  • request further information.

If the adjoining owner does not respond within the required period, they are taken to have agreed to the proposed protection work.

Your Relevant Building Surveyor will administer this process and advise what is required before the building work can proceed.

 

 

How do I obtain my neighbour's details to provide them with a Protection work Notice?

Complete a copy of the Protection Works - Adjoining Owner Contact Details form available below in the Forms & Fees section, and email to basscoast@basscoast.vic.gov.au for processing.

The application must include a copy of the Relevant Building Surveyor's Form 6 – Determination That Protection Work is Required. Adjoining owner contact details cannot be provided without this determination.

 

 

I have received a Protection Work Notice – what do I need to do?

If you own adjoining property and receive a Protection Work Notice, you should carefully review the proposed protection work and any supporting documentation.

You have 14 days from the date the notice is served to respond.

You may:

  • agree to the proposed protection work

  • disagree with the proposed protection work; or

  • request further information to help you consider the proposal.

If you do not respond within 14 days, you are taken to have agreed to the proposed protection work.

If you disagree with the proposed protection work or request further information, the Relevant Building Surveyor must consider the proposal and make a determination about the protection work.

 